BRIGHT, WARM BASEMENT FINISH

Johnstown, CO //  Jan 16′

L to R: Pictures represent stage 1-4 of a 2015-16 COLS basement finish. Stage 1: laying out the floor, plumbing your bathroom; Stage 2: framing; Stage 3: drywall; Stage 4: Trim, doors & windows

L to R: Pictures show maximization of space and light (okay, the pictures try to show what we did). Pic 3 (basement left of pic 2) shows dropped bedroom and storage doors nestled under dropped soffit without looking crowded.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s